|
richard grant and associates
Click here to return to the previous page These pictures were taken on 11 August 2004.Decorators have moved in and the carpets have been laid (and covered). At long last, the dental machinery has arrived and that, and cabinetry is being assembled in the surgeries. Yet more machinery is being installed into the Boiler room, the large silver-coloured drum-like object seen in one shot is the solar-heating storage tank in its own cupboard and holding some 600 litres of hot water! The Reception desk is being assembled, the front path laid and the place is beginning to look like a dental practice.
|